Latest implementers' call
All calls →Nv30 Scoping
Upgrades and FIPs mentioned. Mentions are not decisions.
Meeting notes (5 topics, 11 points)
NV30 Scope: Primary Driver
- FIP-0119: increase max sector lifetime from 5 to 10 years
- Main urgency driver for NV30 timing
- ~118 PiB hard-capped in the affected window; ~76 PiB expiring through Nov 2026, ~87 PiB through March 2027
- ~42 PiB unextendable without this FIP; ~268 PiB/year resealing required to hold capacity flat
- Activating in early December preserves ~42 PiB; January ~40 PiB; March ~31 PiB
NV30 Scope: Small Additions
- Fault fees and reward-derived charges after Solstice (discussion #1302)
- Default fees tied to full block reward; as rewards decline, fault fees could become ~2x appropriate amount
- Proposal: carry consensus weight into miner-actor charges using max(w1, 0.5); ~214,000 FIL in fault fees over last year
- Small parameter change; beneficial for SPs (lower fault fees over time)
- Wouldn't drive an upgrade, but easy to include if NV30 is happening
- Removing legacy Fil+ actors (f06, f07, f080)
- Frozen at NV29 by FIP-0118; state occupies ~11.8 GB across 14M blocks
- Rod opened a PR; low-lift cleanup candidate
- FilOz to do a fresh pass on state cleanup and migration speed improvements
- Light items could opportunistically join NV30; nothing held up for this
NV30 Scope: Deferred or Out
- FIP-0117 (repeated SnapDeals with piece-level integrity): L-sized, requires heavy SP testing; too large for this upgrade
- Fork Signaling Repurposing: deferred since NV28; non-consensus-critical, likely an FRC, not worth the lift given other priorities
- Anything above medium t-shirt size: not targeting for NV30
- FIP-0107 (implicit messages in block receipts), Sealer ID, F3 Calibration Smart Contract Activation: deferred to NV30 but not discussed as active candidates
Ownership and Decision-Making
- Business decision on upgrade timing sits outside this meeting; engineering can be reactive given small implementation lift
- Suggested outreach: identify miner IDs dropping power in Nov/Dec, contact them to gauge willingness to extend sectors if FIP-0119 passes
Next Steps
- Move FIP-0119 to Last Call No objections raised; opening the PR after this meeting.
From the public notes; attributions removed.
About the implementers' calls
Filecoin implementation teams meet regularly to coordinate network upgrades: scope, timelines, test vectors, calibration and mainnet readiness, and blockers on accepted FIPs. Core Devs sets priorities; these calls are where implementers work out how and when they ship.
Network upgrade discussions
Implementers' calls that named each upgrade or discussed its FIPs before activation.NV29Solstice
Live- Implementers2026-11-03 FIL Implementer Call names Solstice
- Implementers2026-10-20 FIL Implementer Call names Solstice
- Implementers2026-10-06 FIL Implementer Call names NV29
- Implementers2026-09-22 FIL Implementer Call names Solstice
- Implementers2026-09-08 FIL Implementer Call names NV29
- Implementers2026-08-25 FIL Implementer Call names NV29
- Implementers2026-08-11 FIL Implementer Call names NV29
- Implementers2026-07-28 FIL Implementer Call names NV29
- +3 earlier
NV28Fire Horse
Live- Implementers2026-11-03 FIL Implementer Call names NV28
- Implementers2026-06-30 FIL Implementer Call names NV28
- Implementers2026-06-16 FIL Implementer Call names NV28
- Implementers2026-05-26 FIL Implementer Call names NV28
- Implementers2026-05-12 FIL Implementer Call names NV28
- Implementers2026-04-28 FIL Implementer Call names NV28
- Implementers2026-04-14 FIL Implementer Call names NV28
- Implementers2026-03-31 FIL Implementer Call names NV28
- +5 earlier
NV27Golden Week
Live- Implementers2026-08-25 FIL Implementer Call names Golden Week
- Implementers2025-10-14 FIL Implementer Call names NV27
- Implementers2025-09-30 FIL Implementer Call names NV27
- Implementers2025-09-16 FIL Implementer Call names NV27
- Implementers2025-09-02 FIL Implementer Call names NV27
- Implementers2025-08-19 FIL Implementer Call names NV27
- Implementers2025-08-05 FIL Implementer Call names NV27
- Implementers2025-07-22 FIL Implementer Call mentions FIP-0101, FIP-0103, FIP-0106
- +4 earlier
NV26Tock
LiveNo implementers' calls in the log discussed this upgrade.
All implementers' calls (45)
| Date | Call | Upgrades and FIPs | Links |
|---|---|---|---|
| Nov 17, 2026 | 2026-11-17 FIL Implementer Call | Notes | |
| Nov 3, 2026 | 2026-11-03 FIL Implementer Call Nv30 Scoping Notes (5 topics, 11 points)NV30 Scope: Primary Driver
NV30 Scope: Small Additions
NV30 Scope: Deferred or Out
Ownership and Decision-Making
Next Steps
From the public notes; attributions removed. | Notes | |
| Oct 20, 2026 | 2026-10-20 FIL Implementer Call I’ve had an SP contact me about the FIL+ deprecation. It may be worthwhile to have a blog link about the pros & cons; Any Lessons Learned / observations we want to carry forward?; Increase maximum sec Notes (7 topics, 27 points)NV29 / Solstice Upgrade Status
FIL+ Deprecation Messaging
NV29 Retrospective and Template Improvements
FIP-0119: Increase Maximum Sector Lifetime to 5 → 10 Years
Network Upgrade Cadence
Wasmtime Dependency Update
Next Steps
From the public notes; attributions removed. | Recording · Notes | |
| Oct 6, 2026 | 2026-10-06 FIL Implementer Call nv29 update; Ok to move back 30 minutes (e.g., 7am Pacific - 14 UTC)?; F3 on calibnet stuck since Oct 1 - might need (another) reset if it’s not addressed soon Notes (6 topics, 13 points)NV29 Network Upgrade: Confirmed Dates
Solstice Contract Upgrade
Comms and Community Readiness
F3 Stuck on Calibnet Since 1st October
Meeting Time Change and Next Steps
Next Steps
From the public notes; attributions removed. | Notes | |
| Sep 22, 2026 | 2026-09-22 FIL Implementer Call Solstice; Upgrade epoch Notes (5 topics, 18 points)Solstice (NV29) Status
Upgrade Timeline
Infra Provider Readiness
Other Updates
Next Steps
From the public notes; attributions removed. | Notes | |
| Sep 8, 2026 | 2026-09-08 FIL Implementer CallNotes (1 topic, 3 points)NV29 / Solstice Upgrade Status
From the public notes; attributions removed. | Notes | |
| Aug 25, 2026 | 2026-08-25 FIL Implementer Call NV29 scope; NV29 timeline; NV 29 naming; Ok to push this meeting back 30 mins? Notes (1 topic, 6 points)NV29 / Solstice Upgrade Status
From the public notes; attributions removed. | Notes | |
| Aug 11, 2026 | 2026-08-11 FIL Implementer Call NV 29 Timeline Upgrade; Solstice Implementation Timeline; FIP Backlog, looking ahead to NV30 (probably in 2027), What is T-shirt sizing for these efforts? | Notes | |
| Jul 28, 2026 | 2026-07-28 FIL Implementer Call nv29 upgrade/timeline/scope | Notes | |
| Jul 14, 2026 | 2026-07-14 FIL Implementer Call nv29 Bandwidth part 2 | Notes | |
| Jun 30, 2026 | 2026-06-30 FIL Implementer Call CT (FF Gov): Review deferred items from nv28: nv29 Network Upgrade Planning · filecoin-project core-devs · Discussion #2; Solstice FIP Draft - Technically sound review; Calibration SPs | Notes | |
| Jun 16, 2026 | 2026-06-16 FIL Implementer Call Anything remaining addressing in “SettleDealPaymentsExported messages consume massive gas, fill block space, crowd out l; nv29 tracking/planning next steps; FIP discussions: Clear State Simply; Securi Notes (5 topics, 14 points)Settled Deal Payments Gas Issue (FIP 115 / NV28)
NV29 Upgrade Prep
Security Triage and AI Agents
Recommended Reading
Next Steps
From the public notes; attributions removed. | Notes | |
| May 26, 2026 | 2026-05-26 FIL Implementer Call | Notes | |
| May 12, 2026 | 2026-05-12 FIL Implementer Call | Notes | |
| Apr 28, 2026 | 2026-04-28 FIL Implementer Call | Notes | |
| Apr 14, 2026 | 2026-04-14 FIL Implementer Call | Notes | |
| Mar 31, 2026 | 2026-03-31 FIL Implementer Call | Notes | |
| Mar 17, 2026 | 2026-03-17 FIL Implementer Call | Notes | |
| Mar 3, 2026 | 2026-03-03 FIL Implementer Call | Notes | |
| Feb 17, 2026 | 2026-02-17 FIL Implementer Call | Recording · Notes | |
| Feb 3, 2026 | 2026-02-03 FIL Implementer Call | Notes | |
| Jan 20, 2026 | 2026-01-20 FIL Implementer Call | Notes | |
| Jan 6, 2026 | 2026-01-06 FIL Implementer Call | Notes | |
| Dec 9, 2025 | 2025-12-09 FIL Implementer Call | Notes | |
| Nov 25, 2025 | 2025-11-25 FIL Implementer Call Some areas getting updated based on FDS discussion | Notes | |
| Oct 28, 2025 | 2025-10-28 FIL Implementer Call | Recording · Notes | |
| Oct 14, 2025 | 2025-10-14 FIL Implementer Call | Notes | |
| Sep 30, 2025 | 2025-09-30 FIL Implementer Call | Notes | |
| Sep 16, 2025 | 2025-09-16 FIL Implementer Call | Notes | |
| Sep 2, 2025 | 2025-09-02 FIL Implementer Call | Notes | |
| Aug 19, 2025 | 2025-08-19 FIL Implementer Call | Notes | |
| Aug 5, 2025 | 2025-08-05 FIL Implementer Call | Notes | |
| Jul 22, 2025 | 2025-07-22 FIL Implementer Call | Notes | |
| Jul 8, 2025 | 2025-07-08 FIL Implementer Call | Notes | |
| Jun 24, 2025 | 2025-06-24 FIL Implementer Call | Notes | |
| Jun 10, 2025 | 10th June 2025 FIL Implementer Call F3 Snapshots; Actor-utils release; Current status on the contact point for OpsGenie in (Starboard) Grafana for the F3 alerts?; Governance updates Notes (3 topics, 7 points)F3 Snapshot Format Discussion
Infrastructure Updates
Governance Updates
From the public notes; attributions removed. | Notes | |
| May 27, 2025 | 27th May 2025 FIL Implementer Call Elliptic Research dissolving at the end of the month; nv27; FIP-100; Common Node APIs and RPC definitions | Notes | |
| May 6, 2025 | 6th May 2025 FIL Implementer Call F3 update; () F3-aware snapshots; () FYI: filecoin-project rust crate ownership is getting cleaned up per; () Are there topics we want to go deeper on together in Toronto / FDS? | Notes | |
| Apr 22, 2025 | 22nd April 2025 FIL Implementer Call F3 activation update; F3 operation items before F3 activation; Lotus F3-aware v2 APIs; nv25 | Notes | |
| Apr 8, 2025 | 8th April 2025 FIL Implementer Call nv25 related date adjustments due to last week’s ref-fvm issue (read more); Retroing ref-fvm regression; F3 passive testing | Notes | |
| Mar 25, 2025 | 25th March 2025 FIL Implementer Call nv25; Q2 planning | Notes | |
| Mar 11, 2025 | 11th March 2025 FIL Implementer Call Spark / IPNI ?; Elliptic Research; NV25 suggested scope, progress update/readiness | Notes | |
| Feb 25, 2025 | 25th February 2025 Implementer Call F3 contract activation integration; FIP-0100: Mining software removing BB; FIP-0098: Simplify termination fee calculation to a fixed percentage of initial pledge; Is that out now? | Notes | |
| Feb 11, 2025 | 11th February 2025 Implementer Call F3 sync items; FIP-0098 | Notes | |
| Jan 28, 2025 | 28th January 2025 Implementer Call nv25 update; Decoupling FIPs / Network Upgrades timelines; DDO <> Spark <> Boost —> Could not be changed in Boost without redoing core Boost. | Notes |
No calls match.
From the implementers' public meeting notes (filecoindev.notion.site). An upgrade tag means the call named that upgrade or discussed its FIPs; mentions are not decisions.